UR-ENERGY INC.

WKN
A0HMUF
ISIN
CA91688R1082
  • Equities
  • Equities international
An error occured while loading the chart data.

0.583 EUR Sell

0.604 EUR Buy

+0.00 abs.

0.0 % rel.

2019-01-16 10:57 pmLang & Schwarz
  • Close / Open 0.594 / 0.584
  • High / Low (1 day) 0.600 / 0.571
  • High / Low (1 Year) 0.786 / 0.500
  • 1 Week +0.6 %
  • 1 Month +3.2 %
  • 1 Year -3.7 %

Selected Top-Trade

There are no top-trades for this security.

Popularity indicator

An error occured while loading the chart data.

Trading sentiment

An error occured while loading the chart data.

Latest Comments

CreativeHedge URAN only
Ur-Energy is a junior uranium mining company operating the Lost Creek in-situ recovery uranium facility in south-central Wyoming. The Lost Creek processing facility has a two million pounds per year nameplate capacity with a one million pound annual rate planned from the mining areas at Lost Creek. Ur-Energy engages in the identification, acquisition, exploration development, and operation of uranium projects. Shares of Ur-Energy trade on the NYSE MKT under the symbol “URG” and on the Toronto Stock Exchange under the symbol “URE". Ur-Energy’s corporate office is located in Littleton, Colorado; its registered office is in Ottawa, Ontario. In the United States, the Company’s current Wyoming properties contain, after subtracting 1.358 million pounds of uranium produced from the Lost Creek Property through September 30, 2015, NI 43-101 compliant resources of 34.27 million pounds of uranium in the measured and indicated category, plus 8.24 million pounds in the inferred category. The Amended Preliminary Economic Assessment was issued February 8, 2016. Our newest project, Shirley Basin, is one of the assets acquired as a part of the Pathfinder Mines Corporation transaction which we closed in December 2013. We also acquired all the historic geologic and engineering data for the project, which has nearly 3,200 historic drill holes. The Preliminary Economic Assessment was issued January 27, 2015. Baseline studies necessary for permitting and licensing of the project are complete, the WDEQ application for permit to mine has been submitted, and work on other applications is underway.
show more
Don't miss out on anything!
To see all comments of this underlying please create an account.